MAKİMSAN
Client | DIRECTORATE GENERAL OF TURKISH RAILWAYS – DEPARTMENT OF RAILWAYS CONSTRUCTION | |
Total Volume of Excavation | 48.942.873,00 m³ | |
Total Volume of Fill | 16.511.140,00 m³ | |
Number of Tunnels | 10 EA | |
Total Length of Tunnel | 8.752,00 m | |
Total Length of Railway Line | 161,80 km | |
Number of Cut-and-Cover Tunnels | 2 EA | |
Total Length of Cut-and-Cover Tunnel | 460 m | |
Number of Viaducts | 17 EA | |
Total Length of Viaduct | 6.432,45 m | |
Number of Underpasses | 74 EA | |
Number of Overpasses | 31 EA | |
Number of Culverts | 187 EA | |
Number of Bridges | 24 EA |